PHASE 2

Phase 2

Phase 2 of the Port of Caio development consists of the following components:

• 1,130 meters berth length with water depth of 16 meters (simultaneous docking of 4 big vessels), accommodating some of the largest vessels in the world
• Access channel: 200 m wide; 18.0 m of water depth
• Basin: 200 m wide; 16.0 m of water depth
• Up to 60 containers per hour can be handled per berth, utilising state-of-the-art gantry cranes and world-class container handling equipment